How to Install the Led Screen Ground Support for outdoor Rent, Church, Wedding, stages, DJs, Displays, Visuals?
1. Setup the 2 lifting towers and connect the beam between each pillar on floor.
2. Tie the fiber belts onto the the beam
3. Connect the hanging beams to the fibre belts
4. Connect the first row of LED screens to the hanging beams and fasten it with the fast locks and fix the power cables and the signal cables.
5. Install the second row of the led screens panels and lock them with the fast lock at the sides, and 4way locks in the middel, as well as the power cables and signal cables.
6. Install the third row of of LED walls by the same to the second row, then come to the forth row, the fifth row.
7. Checking all the power cables and the signal cables of panels.
8. Connect the power cables from the led wall screen panels to the power voltage distributor, and the video media processor, then it is finished.
9. LED screen truss support is usually set up as backdrop for the portable stage systems.
If you have questions or suggestions, please leave us a message,we will reply you as soon as we can!
We will contact you as soon as possible !
Tel : +86 186 6570 2368
Mobile phone: +86 186 6570 2368
Email : info@itsctruss.com
Gaopu Industrial Area, Jiaoxin, Shijing, Baiyun Dist.
Scan to wechat: